CO. RD 89 over TURKEY CREEK

0.3 MI N SR243 CO 89 JCT · County 059, Alabama · Built 2016 · 2 Lanes · 188 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
021031
Year Built
2016
Length
9.3 m (30.5 ft)
Max Span
4.3 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
188
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$304,000
Total Project Cost
$334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.