County Road 61 over Butler Creek

1.5 mi N int co 8 · County 077, Alabama · Built 2018 · 2 Lanes · 133 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
020981
Year Built
2018
Length
73.2 m (240.2 ft)
Max Span
24.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
133
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,601,000
Total Project Cost
$1,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.