AL 145 over WAXAHATCHEE CRK

CHILTON * SHELBY CO LINE · County 021, Alabama · Built 2020 · 2 Lanes · 2,790 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
020953
Year Built
2020
Length
164.6 m (540 ft)
Max Span
41.1 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
2,790
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,425,000
Total Project Cost
$5,968,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.