County Road 7 over CUBAHATCHEE CREEK

cr 7 · County 087, Alabama · Built 2015 · 2 Lanes · 291 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
020899
Year Built
2015
Length
182.9 m (600.1 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
291
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,639,000
Total Project Cost
$4,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.