S.R. 205 over DRUM CREEK

2 MI N SR 75/205 · County 095, Alabama · Built 2019 · 2 Lanes · 3,460 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020892
Year Built
2019
Length
40.5 m (132.9 ft)
Max Span
40.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
3,460
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,066,000
Total Project Cost
$1,173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.