CR-2 over Escatawpa River

Yellow Pine · County 129, Alabama · Built 2017 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

31.406619, -88.413792

This bridge is in worse condition than 34.5% of bridges in County 129. The average bridge in Alabama is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
020889
Year Built
2017
Length
73.2 m (240.2 ft)
Max Span
24.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
35
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,716,000
Total Project Cost
$1,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.