CR-23 over Wiggins Creek

CR-23 @ Lamar County Line · County 057, Alabama · Built 2015 · 2 Lanes · 177 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020858
Year Built
2015
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
177
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$544,000
Total Project Cost
$598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.