County Rd 52 over Cahaba River

CR 52 over Cahaba River · County 117, Alabama · Built 2021 · 2 Lanes · 15,911 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020819
Year Built
2021
Length
135.9 m (445.9 ft)
Max Span
72.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
15,911
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,148,000
Total Project Cost
$4,563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.