CR 6 over ARMSTRONG CREEK

CORTELYOU · County 129, Alabama · Built 2014 · 2 Lanes · 560 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

31.427928, -88.010567

This bridge is in worse condition than 56.7% of bridges in County 129. The average bridge in Alabama is 0 years old; this one is 12 years old.

Nearby Bridges

Bridge Details

Structure #
020812
Year Built
2014
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
560
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,468,000
Total Project Cost
$1,615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.