County Road over Sizemore Creek

3.5 mi N Atmore · County 053, Alabama · Built 2014 · 2 Lanes · 575 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
020794
Year Built
2014
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
575
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$546,000
Total Project Cost
$601,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.