Cody Kennedy Rd over U.T. of Pea Creek

1.9 MI East of CR-17 · County 005, Alabama · Built 2016 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
020791
Year Built
2016
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$815,000
Total Project Cost
$897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.