JONES FARM RD over UNKNN TRBTRY TO GREER CR

1/4 MI. E. OF GREER CR. · County 065, Alabama · Built 2013 · 2 Lanes · 5 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020766
Year Built
2013
Length
16.2 m (53.1 ft)
Max Span
4.6 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
5
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$252,000
Total Project Cost
$277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.