COUNTY ROAD 59 over DRY CREEK

LAPINE HIGHWAY · County 041, Alabama · Built 2018 · 2 Lanes · 378 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020761
Year Built
2018
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
378
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,024,000
Total Project Cost
$2,226,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.