AL 158 over Seabury Creek

AL 158 @ Seabury · County 097, Alabama · Built 2020 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020526
Year Built
2020
Length
104.9 m (344.2 ft)
Max Span
21 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,219,000
Total Project Cost
$4,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.