Future SR158/US98 over Collins Creek Tributary

1.3 M EAST GLENWOOD RD · County 097, Alabama · Built 2022 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020518
Year Built
2022
Length
201.2 m (660.1 ft)
Max Span
39.6 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,345,000
Total Project Cost
$6,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.