SR 181 over DRAINAGE DITCH CROSS

3.07 mi N OF SR 104 · County 003, Alabama · Built 2022 · 4 Lanes · 16,942 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
020510
Year Built
2022
Length
12.4 m (40.7 ft)
Max Span
4 m
Lanes
4
Daily Traffic
16,942
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,272,000
Total Project Cost
$1,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.