BO HOWARD RD over LONG BRANCH

DEER HEAD (43) · County 129, Alabama · Built 1965 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
020499
Year Built
1965
Length
13.2 m (43.3 ft)
Max Span
4.5 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
50
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.