HUFF LANE over EARLY BRANCH

0.6 MI N US HWY 11 · County 115, Alabama · Built 1968 · 2 Lanes · 170 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
020316
Year Built
1968
Length
14.1 m (46.3 ft)
Max Span
4.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
170
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.