SR-173 MP 3.370 over BLACKWOOD CREEK

1 m. n. henry co. 16 · County 067, Alabama · Built 2018 · 2 Lanes · 680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020220
Year Built
2018
Length
89.9 m (294.9 ft)
Max Span
41.1 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
680
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,142,000
Total Project Cost
$3,456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.