I20 over BARRY STREET

.5 MI W JCT SR21 · County 015, Alabama · Built 2012 · 3 Lanes · 22,944 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020182
Year Built
2012
Length
59.8 m (196.2 ft)
Max Span
24 m
Width
18.5 m (60.7 ft)
Lanes
3
Daily Traffic
22,944
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,888,000
Total Project Cost
$3,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.