TIMBERLINE DRIVE over DIXIE RAILROAD

TIMBERLINE SUBDIVISION · County 117, Alabama · Built 2007 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020155
Year Built
2007
Length
25 m (82 ft)
Max Span
10.4 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$858,000
Total Project Cost
$944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.