AL 605 over BEAVER CREEK

.25 MI.S FLOWERS CHPL RD · County 069, Alabama · Built 2008 · 2 Lanes · 10,260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020003
Year Built
2008
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
20.3 m (66.6 ft)
Lanes
2
Daily Traffic
10,260
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,284,000
Total Project Cost
$3,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.