ATLANTA HWY over OLIVER CREEK

1.4 MI E OF EASTERN BLVD · County 101, Alabama · Built 2009 · 4 Lanes · 18,520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019918
Year Built
2009
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
18,520
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,315,000
Total Project Cost
$1,447,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.