I-10 EBL * WBL over US 90 EBL * WBL

I-10 @ US 90 INTERCHANGE · County 097, Alabama · Built 2012 · 2 Lanes · 77,791 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019832
Year Built
2012
Length
97.5 m (319.9 ft)
Max Span
27.4 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
77,791
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,080,000
Total Project Cost
$3,388,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.