CR-9 over MUD CREEK RELIEF

8.2 MILES SW OF STAR · County 075, Alabama · Built 2006 · 2 Lanes · 430 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019792
Year Built
2006
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
430
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,252,000
Total Project Cost
$1,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.