US 80 (-) over AL 17

5.9 MI EAST OF CUBA · County 119, Alabama · Built 2012 · 2 Lanes · 1,475 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
019674
Year Built
2012
Length
78 m (255.9 ft)
Max Span
36.6 m
Width
16.7 m (54.8 ft)
Lanes
2
Daily Traffic
1,475
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,265,000
Total Project Cost
$3,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.