WALKER LANE over FLINT RIVER RELIEF

.5 MI. E OF ROY DAVIS RD. · County 089, Alabama · Built 2007 · 2 Lanes · 907 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
019577
Year Built
2007
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
907
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,494,000
Total Project Cost
$1,643,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.