COUNTY ROAD 156 over TRIB TO SIPSEY RIVER

0.4 MI W JENA · County 063, Alabama · Built 2006 · 2 Lanes · 770 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
019552
Year Built
2006
Length
9.1 m (29.9 ft)
Max Span
3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
770
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$824,000
Total Project Cost
$906,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.