OAKDALE ROAD over WEOWOKA CREEK

2.0 MILES SOUTH AL HWY 76 · County 121, Alabama · Built 2006 · 2 Lanes · 820 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
019511
Year Built
2006
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
820
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,716,000
Total Project Cost
$1,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.