COUNTY ROAD 30 over BR OFF HIGH LOG CREEK

1.8 MI.S OF INT CO30*ST26 · County 113, Alabama · Built 2005 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
019393
Year Built
2005
Length
11.3 m (37.1 ft)
Max Span
3.7 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$460,000
Total Project Cost
$506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.