AL 157 over CATOMA LAKE

1.6 MIN NORTH JCT AL 69 · County 043, Alabama · Built 2013 · 2 Lanes · 6,855 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019363
Year Built
2013
Length
204.2 m (669.9 ft)
Max Span
30.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,855
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,021,000
Total Project Cost
$6,623,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.