UPPER RIVER ROAD over MADDEN BRANCH

5 MI WEST OF SR 67 · County 103, Alabama · Built 2005 · 2 Lanes · 1,831 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
019286
Year Built
2005
Length
8.8 m (28.9 ft)
Max Span
2.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,831
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$456,000
Total Project Cost
$502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.