DYAS ROAD over TRIB. TO BUSHY CREEK

1.0 MI. N. OF US. 31 · County 003, Alabama · Built 2007 · 2 Lanes · 320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019282
Year Built
2007
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
320
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$923,000
Total Project Cost
$1,015,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.