NESBIT LAKE ROAD over COFFEE CREEK

NESBIT LAKE RD · County 015, Alabama · Built 2004 · 2 Lanes · 1,107 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
019106
Year Built
2004
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,107
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$879,000
Total Project Cost
$967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.