SR 5 over SR 28

INT. OF S.R. 5 AND 28 · County 131, Alabama · Built 2005 · 2 Lanes · 2,380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019034
Year Built
2005
Length
73.5 m (241.1 ft)
Max Span
36.9 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,380
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,640,000
Total Project Cost
$2,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.