FAULK MILL ROAD over CLAYBANK CREEK

SEC 26 T6N R23E · County 045, Alabama · Built 2003 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
018913
Year Built
2003
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,121,000
Total Project Cost
$1,233,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.