CR 15 over JUDY CREEK

S-6 T-6-N R25-E · County 045, Alabama · Built 2002 · 2 Lanes · 1,041 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018818
Year Built
2002
Length
114.1 m (374.3 ft)
Max Span
10.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,041
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,694,000
Total Project Cost
$2,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.