NEW CUT ROAD over CROWDABOUT CREEK

2.0 MI SOUTH SR 36 · County 103, Alabama · Built 2003 · 2 Lanes · 580 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018797
Year Built
2003
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
580
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,419,000
Total Project Cost
$1,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.