CO RD 208 over I-85

FAIRFAX ROAD - EXIT 77 · County 017, Alabama · Built 2006 · 6 Lanes · 15,823 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
018762
Year Built
2006
Length
82.3 m (270 ft)
Max Span
27.4 m
Width
28.3 m (92.8 ft)
Lanes
6
Daily Traffic
15,823
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,822,000
Total Project Cost
$6,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.