COUNTY ROAD 26 over SIPSEY CREEK

3 MI N LAMAR CO LINE · County 093, Alabama · Built 2002 · 2 Lanes · 255 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
018585
Year Built
2002
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
255
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,468,000
Total Project Cost
$1,615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.