COUNTY ROAD 83 over ELBERTA CREEK

0.6 MI. N. OF U.S.98 · County 003, Alabama · Built 2003 · 2 Lanes · 1,992 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018507
Year Built
2003
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,992
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$838,000
Total Project Cost
$922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.