LECROY DRIVE over PARKER BRANCH

1/2 MI E OF WYNNVILLE · County 009, Alabama · Built 2003 · 2 Lanes · 721 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
018370
Year Built
2003
Length
8.8 m (28.9 ft)
Max Span
4.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
721
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$303,000
Total Project Cost
$333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.