AL-18 over Cut Bank Creek

0.9 MI E Miss St Line · County 075, Alabama · Built 2004 · 2 Lanes · 2,421 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018285
Year Built
2004
Length
82.3 m (270 ft)
Max Span
13.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,421
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,658,000
Total Project Cost
$2,924,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.