COUNTY ROAD 34 over PEA RIVER

SEC 6 T12 R25 · County 011, Alabama · Built 2001 · 2 Lanes · 140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018128
Year Built
2001
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
140
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,277,000
Total Project Cost
$1,405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.