SR21 over CHEAHA CREEK

.9 MI N CO. RD. 96 · County 121, Alabama · Built 2022 · 2 Lanes · 10,626 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

33.503417, -86.004972

This bridge is in worse condition than 52.7% of bridges in County 121. The average bridge in Alabama is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
018072
Year Built
2022
Length
105.2 m (345.1 ft)
Max Span
35.1 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
10,626
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,603,000
Total Project Cost
$3,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.