AL-74 over Buttahatchee River

AL-74 b/t AL-241*129 · County 093, Alabama · Built 2010 · 2 Lanes · 1,057 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018069
Year Built
2010
Length
64 m (210 ft)
Max Span
21.3 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
1,057
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,347,000
Total Project Cost
$2,582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.