CO. RD. 59 over WEDOWEE CR.

1 MI.SO. ROCKY BRANCH · County 111, Alabama · Built 2001 · 2 Lanes · 580 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
018000
Year Built
2001
Length
17.8 m (58.4 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
580
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$831,000
Total Project Cost
$914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.