US 84 MP 135.972 over FIVE RUN CREEK

4.2 MI. E. JCT US 29 · County 039, Alabama · Built 2005 · 2 Lanes · 4,615 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017980
Year Built
2005
Length
109.7 m (359.9 ft)
Max Span
13.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,615
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,417,000
Total Project Cost
$3,759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.