CO RD 23 over CEDAR CREEK

AT CO RD 90 CO RD 23 JCT. · County 059, Alabama · Built 2000 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017914
Year Built
2000
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
110
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,802,000
Total Project Cost
$1,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.