TALLADEGA CO.207 over NORFOLK SOUTHERN R.R.
.5 MI.NORTH OF U.S.78 · County 121, Alabama · Built 2001 · 4 Lanes · 3,950 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
33.609347, -86.162456
This bridge is in worse condition than 52.7% of bridges in County 121. The average bridge in Alabama is 0 years old; this one is 25 years old.
Nearby Bridges
CO.207 over BLUE EYE CREEK
Built 2002
TALLDEGA CO. 207 over LOGAN MARTIN BACKWATER
Built 2001
CO207(EXIT165) over I-20
Built 1963
I - 20 WEST over COOSA RIVER
Built 1963
I - 20 EAST over COOSA RIVER
Built 1963
SR4/US78 over BLUE EYE CREEK
Built 2001
DEPOTE ST over CREEK
Built 1935
AL - 4 (US 78) over COOSA RIVER
Built 1930
CO 007 over BLUE EYE CREEK
Built 1953
SR-77 over I-20
Built 1964
Bridge Details
- Structure #
- 017881
- Year Built
- 2001
- Length
- 121.9 m (399.9 ft)
- Max Span
- 36.6 m
- Width
- 22.2 m (72.8 ft)
- Lanes
- 4
- Daily Traffic
- 3,950
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,438,000
- Total Project Cost
- $7,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.